General Contractor Agreement Stipulated Fee

Document Overview

This is a fillable general contractor agreement stipulated fee. Click any blank field in the document below, type your information, and your entries will autosave in your browser. Use the toolbar at the top to print, save as PDF, or download a completed copy. Below the form, you'll find a guide to using this document, common mistakes to avoid, and answers to the questions we hear most often about general contractor agreement stipulated fee.

This general contractor agreement is between Name Individual / Business , an individual (the "Contractor") and Name Individual / Business , an individual (the "Owner").

The Owner is the owner of the Property (as defined below).

The Owner wishes to engage the Contractor as a general contractor to perform certain Work (as defined below) on the Property for the Owner in accordance with the drawings and specifications in Exhibit A. Yes / No

The Contractor is registered with the state as a contractor, and has a registration number of License expiring on Date .

The Contractor wants to perform the Work on the Property in accordance with the drawings and specifications in Exhibit A.

The parties therefore agree as follows:

1. ENGAGEMENT; SERVICES.

2. SCOPE OF WORK.

The Contractor shall furnish all of the necessary materials, tools, machinery, supervision, relocation and, site security and perform all of the work described in Exhibit B (the "Work"), all in accordance with this agreement. The Work shall be performed on that certain property located at Street address , City , State , ZIP Code (the "Property"), and as more specifically described in Exhibit B. The Contractor shall perform the services and provide the materials for which it is responsible, will accomplish this Work in the manner and in the time stated in this agreement, and in accordance with the drawings and specifications attached as Exhibit A, and will provide the deliverables as required.

3. TIME OF COMPLETION.

4. CONTRACT PRICE.

The Owner shall pay to the Contractor for the performance of this agreement the amount of $ Amount (the "Contract Price").

5. PROGRESS PAYMENTS.

6. LICENSES, PERMITS AND INSURANCE.

Licenses and Permits. The Contractor shall comply with all state and local licensing and registration requirements for the type of work performed. The Contractor shall obtain and, at its expense, pay for all licenses or permits required by law to accomplish any Work required in connection with this agreement and indemnify the Owner for any violations.

7. REPRESENTATIONS.

8. WAIVER OF LIABILITY.

If the Contractor is injured while performing the Work, the Owner will be exempt from liability for those injuries to the fullest extent allowed by law.

9. SURETY BOND.

Before starting the Work, the Contractor shall obtain a surety bond in the amount of $ Amount , which will cover its obligations under this agreement.

10. INDEMNIFICATION.

The Contractor shall indemnify the Owner against all damages, liabilities, costs, expenses, claims, or judgments, including, without limitation, reasonable attorneys' fees and disbursements that any of them may suffer from or incur and that arise or result primarily from (a) any gross negligence or willful misconduct of the Contractor arising from or connected with Contractor's carrying out of its duties under this agreement, or (b) the Contractor's breach of any of its obligations, agreements, or duties under this agreement.

11. WARRANTY.

12. TERMINATION.

This agreement may be terminated:

In the event of termination not the fault of the Contractor, the Company shall promptly pay the Contractor according to the terms of Exhibit A for services rendered before the effective date of the termination. The Contractor acknowledges and agrees that no other compensation, of any nature or type, shall be payable hereunder following the termination of this agreement.

13. NATURE OF RELATIONSHIP.

The Contractor is not an employee of the Owner; the Contractor is working in its capacity as an independent contractor. The Contractor shall indemnify the Owner for any claims, including (but not limited to) liability insurance, workers' compensation, and tax withholding for the Contractor's employees.

14. NOTE ABOUT EXTRA WORK AND CHANGE ORDERS.

All changes or deviations in the Work ordered by the Owner must be in writing as a change order, a form of which is attached as Exhibit C. The Contract Price and time of completion, if applicable, will be increased or decreased accordingly by the parties' agreement. Any claims that the Contract Price or time of completion should be increased based on changes or deviations in the Work must be presented to the Owner by the Contractor in writing. The Owner's written approval of such Contract Price or time of completion increase must be obtained by the Contractor before any change or deviation in the Work is started. The valuation of the Contract Price change will be assessed on the basis of the valuation of similar work included in this agreement.

15. OWNERSHIP OF DRAWINGS AND OTHER ITEMS.

All drawings, reports, designs, sketches, working drawings, shop drawings, documents, certificates, plans, specifications, estimates, memoranda, analyses, calculations, models and other tangible evidence of the Contractor's work product prepared in connection with the Work shall become and remain the sole property of the Owner. The Contractor may retain copies of its work product for its records, but may not use this work product (except in performing the Work) without the written consent of the Owner. Any devices (other than equipment or devices that constitute part of the Work) or methods now being used in the marketplace, and incorporated into the project, are not considered to be property of the Owner. Innovative construction methods or mechanical devices developed by the Contractor or its subcontractors and used in connection with the Work are not considered the property of the Owner unless those methods or devices were developed by the Owner or the Owner's separate contractors.

16. TYPES OF MATERIALS.

All materials used by the Contractor in performing the work will be new, in compliance with all applicable laws and codes, and covered by a manufacturer's warranty (if appropriate) except as agreed upon in a signed writing by the Owner.

17. OWNERSHIP OF MATERIALS.

Any materials that are unfixed and required to perform the Work and that are delivered to the Property under this agreement shall remain the property of the Contractor until they have been paid for by the Owner.

18. MATERIALS IN SHORT SUPPLY.

If any of the materials set out in Exhibit A are in short supply or are unavailable for an unreasonable amount of time, the Owner shall select alternative material of similar quality from alternative (and readily available) materials proposed by the Contractor. The responsibility for paying any difference in price between the original materials and the alternative materials shall lie with the Owner.

19. GOVERNING LAW.

20. AMENDMENTS.

No amendment to this agreement will be effective unless it is in writing and signed by both parties.

21. ASSIGNMENT AND DELEGATION.

22. COUNTERPARTS; ELECTRONIC SIGNATURES.

23. SEVERABILITY.

If any one or more of the provisions contained in this agreement is, for any reason, held to be invalid, illegal, or unenforceable in any respect, that invalidity, illegality, or unenforceability will not affect any other provisions of this agreement, but this agreement will be construed as if those invalid, illegal, or unenforceable provisions had never been contained in it, unless the deletion of those provisions would result in such a material change so as to cause completion of the transactions contemplated by this agreement to be unreasonable.

24. NOTICES.

Name/title Owner Name
Street address
City , State , ZIP Code
Email
Name/title Contractor Name
Street address
City , State , ZIP Code
Email

25. WAIVER.

No waiver of a breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this agreement will be effective unless it is in writing and signed by the party waiving the breach, failure, right, or remedy. No waiver of any breach, failure, right, or remedy will be deemed a waiver of any other breach, failure, right, or remedy, whether or not similar, and no waiver will constitute a continuing waiver, unless the writing so specifies.

26. ENTIRE AGREEMENT.

This agreement constitutes the final agreement of the parties. It is the complete and exclusive expression of the parties' agreement about the subject matter of this agreement. All prior and contemporaneous communications, negotiations, and agreements between the parties relating to the subject matter of this agreement are expressly merged into and superseded by this agreement. The provisions of this agreement may not be explained, supplemented, or qualified by evidence of trade usage or a prior course of dealings. Neither party was induced to enter this agreement by, and neither party is relying on, any statement, representation, warranty, or agreement of the other party except those set forth expressly in this agreement. Except as set forth expressly in this agreement, there are no conditions precedent to this agreement's effectiveness.

27. HEADINGS.

The descriptive headings of the sections and subsections of this agreement are for convenience only, and do not affect this agreement's construction or interpretation.

28. EFFECTIVENESS.

This agreement will become effective when all parties have signed it. The date this agreement is signed by the last party to sign it (as indicated by the date associated with that party's signature) will be deemed the date of this agreement.

29. NECESSARY ACTS; FURTHER ASSURANCES.

Each party shall use all reasonable efforts to take, or cause to be taken, all actions necessary or desirable to consummate and make effective the transactions this agreement contemplates or to evidence or carry out the intent and purposes of this agreement.

SIGNATURE PAGE FOLLOWS

Each party is signing this agreement on the date stated opposite that party's signature.

Owner Name
Date:__________________________________ By:____________________________________________________________
Name: Yes / No Name Name Title: Title
Contractor Name
Date:__________________________________ By:____________________________________________________________
Name: Yes / No Name Name Title: Title





PAGE BREAK HERE

EXHIBIT A
DRAWINGS AND SPECIFICATIONS
(attach to agreement)

PAGE BREAK HERE

EXHIBIT B
SCOPE OF WORK

(1) General:

(2) Safety

(3) Management

(4) Design

(5) Construction

(6) Schedule



PAGE BREAK HERE



EXHIBIT C
FORM OF CHANGE ORDER

Change Order No:
Date:

Contractor's Name and Address:

Owner's Name and Address:



THE CONTRACTOR AGREEMENT IS HEREBY CHANGED AS FOLLOWS:

Additional days needed to complete Work: (if none, state "NONE"):

ALL OTHER TERMS AND CONDITIONS OF THE CONTRACTOR AGREEMENT THAT ARE NOT CHANGED BY THIS CHANGE ORDER REMAIN IN FULL FORCE AND EFFECT.

PREVIOUS CONTRACT PRICES: $

REVISED CONTRACT PRICE: $

ACCEPTANCE

The above prices, specifications, and conditions are satisfactory, and are hereby accepted. The Contractor is authorized to do the work as specified, and the Owner shall make payments as outlined above.



Owner Signature: _________________________________________     Date: __________________



Contractor Signature: ______________________________________     Date: __________________